PG in BIM Modeling and Coordination

Download Broacher

START:
December 25, 2024
DURATION:
8 Month
CREDIT:
10
PRICE
Original price was: ₹99,999.00.Current price is: ₹90,000.00.

INSTRUCTORS:

BIM TECHNOLOGY
Working department

Address

Online   View map

PG Program in BIM Modelling & Coordination

This Program is design to learn BIM 3D 4D 5D and 6D with implimenting in diffrent civil project i.e Building Project, Bridge Project and Industrial structure. We ensure a holistic and comprehensive soltion for structures and professionals.

Program Outcome

  1. BIM Modeler
  2. BIM Coordinator 

Program Certification

  1. structurex
  2. Bexel 
  3. Autodesk
  4. Skill India

E-Class Room/ Live Session

  1. 100% Live classes 
  2. Doubt Clearing Session (In-class. Post Class. Revision/Clarification on any topic
  3. Access of e-learning portal

Module:01


1.1 BIM Research and Study: BIM in AEC industry is new era data driven technology. Steps involved.

Plan: Inform project planning by combining reality capture and real-world data to generate context models of the existing built and natural environment.

Design: During this phase, conceptual design, analysis, detailing and documentation are performed. The preconstruction process begins using BIM data to inform scheduling and logistics.

Build: During this phase, fabrication begins using BIM specifications. Project construction logistics are shared with trades and contractors to ensure optimum timing and efficiency.

Operate: BIM data carries over to operations and maintenance of finished assets. BIM data can be used down the road for cost-effective renovation or efficient deconstruction too.

1.2 BIM Modelling: Autodesk Revit will be used to model data of any existing or live projects.

Architecture Data:

  • Design to documentation: Place walls, doors, and windows. Generate floor plans, elevations, sections, schedules, 2D and 3D views, and renderings quickly and accurately.
  • Analysis: Optimize building performance in early-stage design, run cost estimates, and monitor performance over the lifetime of the project and the building.
  • Visualization: Generate photorealistic renderings. Create documentation with cutaways, 3D views, and stereo panoramas to extend your design to virtual reality.
  • Coordination and collaboration: Share, sync, and iterate designs with engineers and contractors in Revit in a unified project environment.

Structure Data

  • Concrete reinforcement: Model 3D concrete reinforcement in an advanced BIM environment. Create detailed reinforcement designs and shop drawing documentation with rebar bending schedules.
  • Design to detail workflows: Connect steel design and detailing workflows. Define design intent for a higher level of detail for steel connections in the Revit model.
  • Documentation: Create more accurate, detailed documentation of steel and concrete designs.
  • Analysis: Conduct structural analysis and export to analysis and design applications with the analytical model while you create the physical model in Revit.

MEP Data

  • Integrated design: Streamline the engineering design process with Revit. Coordinate and communicate design intent in a single model before construction begins.
  • Analysis: Conduct simulations and interference detection early in the design process. Use conceptual energy analysis data for engineering-driven calculations.
  • Documentation: Design, model, and document building systems in the context of a full building information model, including architectural and structural components.
  • Fabrication: Model for MEP fabrication with tools that automate the fabrication model layout. Prepare a model for detailed coordination of fabrication and installation.
  • Construction Data

Module:02


BIM Analysis: To optimize structure, we need BIM analysis

Software: REVIT and RWIND

  • Heat Analysis
  • Solar Analysis
  • Load Analysis
  • Wind Analysis.

Module:03


1.1 BIM Simulation: Autodesk Navisworks

Simulating the progress of the construction activity helps the construction team visualize logistical issues or inefficiencies. The virtual simulation exposes details such as out-of-sequence work, scheduling conflicts between multiple trades, ‘what if’ scenarios, and macro-level construction phasing strategies – all in order to achieve the optimization of the construction schedule.

1.2 4D Simulation: Real timeline of project and clash detection

1.3 5D Cost Timeline of project (Costing)

1.4 6D Project life cycle information

Module:04


BIM Coordination: BIM 360 & BIM Collaborate-Pro

BIM Coordination is a crucial part of BIM Process, with construction manager and coordination between different project aspect. Using cloud based platform the outcome is great.
Clash Detection: Catch errors early and spend more time on the biggest construct ability issues.
Includes Design Collaboration: Track design progress in a shared timeline to get an overall picture of the project. Enable Field Teams from Anywhere: View models on mobile – and give your field team the detailed data they need.

Module:05 BIM 4D 5D with Project Management 


Software: Bexel Manager

BEXEL Manager is a premium BIM solution providing the most comprehensive set of features for advanced 3D visualization, model data management, clash detection, automated QTO, cost management, smart scheduling and progress monitoring.
With extensive data analysis and reporting tools BEXEL Manager empowers all project stakeholders to make informed data-driven decisions based on real-time data.
Smart Scheduling: Advanced 4D BIM scheduling engine designed to bring the functionality of creating fully automated construction schedules and alleviate time consuming, manual sequencing. A smart algorithm finds the optimal solution in terms of minimum construction cost and time and resource balancing even for the most complex projects, containing hundreds of thousands of elements.
Cost Management: A fully integrated 5D BIM Cost Management enables various advanced analyses such as model-based Cost Estimation, Schedule creation and optimization, Construction progress monitoring, and Schedule impact analyses. Cost Management enhances project control by integrating spatial and temporal dimensions with cost data, providing a comprehensive platform for analyses and a more holistic project management process.

Module:05 Visual Programing 


Software: DYNAMO

1.1 Visual Programming: Establishing visual, systemic, and geometric relationships between the different parts of a drawing is key to the design process. Workflows influence these relationships from the concept stage to final design. Similarly, programming allows us to establish a workflow, but through formalizing algorithms.
1.2 Revit and Dynamo: Using Dynamo, you can work with enhanced BIM capabilities in Revit.
there can be utilizing Revit togged to model and analyse complex geometries, automate repetitive processes, minimize human error, and export data to Excel files and other file-types not typically supported by Revit. Dynamo can make the design process more efficient, with an intuitive interface and many pre-made scripting libraries available as well.

Module:06 Argumental Reality 


1.1 AR: Arguments Reality
1.2 VR: Virtual Reality
1.2 Scan to BIM: In a Scan to
BIM process, a laser scanner is used to capture an accurate 3D scan of the real world conditions on a project.
The scan data is then imported
into a 3D modelling environment to create either accurate as-built models or to inform the design with the real world conditions.

Module:07 Redendering


Software: V-RAY

1.1 Rendering: V-Ray Vision gives you access to your own real-time digital camera, allowing for instant feedback and quick iterations with the ability to explore different materials and lighting. Share your projects with clients and collaborators via an executable file.

Module:08 Common Data Environment


Software: BIM 360

“The common data environment (CDE), is the single source of information used to collect, manage and disseminate documentation, the graphical model and non-graphical data for the whole project team,” says that  “Creating this single source of information facilitates collaboration between project team members and helps avoid duplication and mistakes.”

Learning Path


  1. Week 01 : Introduction to Program 
  2. Week 02 : IT Session
  3. week 03: Personal Intrection 
  4. Week 04: BIM Research (10 hrs.)
  5. Week 04-16 : (REVIT) BIM Modelling (Structure+Architecture+MEP) (60 hrs.)
  6. Week 17-18 :(REVIT+RWIND) BIM Analysis 
  7. Week 19-20 : (Naviswork)BIM 4D 5D Clash Detection, Timeline, Costing
  8. Week 21 : (Dynamo) Visual Programing 
  9. Week 22-25 : (Bexel Manager) BIM 4D & 5d With Project Management 
  10. Week 26-27 : AR VR & Rendering 
  11. Week 28-30: Assesment 
  12. Week 31-32 Career Assistance 

Software & Tools Cover (12+)


 

Global hiring companies


 

Enrollment From 15+ Country 


Note**

Student must have their own system 

Leave a Reply

Your email address will not be published. Required fields are marked *